Solutions · EV Charging

    Commercial EV charging optimisation in WA

    A row of EV chargers can double a commercial site's peak demand overnight. We coordinate charging at the site level so it lands in the right windows, stays inside the building's load envelope, and works with the solar and storage already on site.

    The New Load

    EV charging is a peak demand event waiting to happen.

    A handful of fast chargers on a commercial site can pull more power than the rest of the building combined. Workplace charging at 5pm on a hot Thursday lands in exactly the wrong window. Resident charging in a strata car park can trip the building's supply if every car plugs in on arrival.

    Without coordination, EV charging becomes the most expensive load on the site. With coordination, it becomes one of the most controllable. The platform shares the decision with load management and any battery on site.

    What We Coordinate

    Four decisions we make on every charging session.

    Load Envelope Protection

    The building doesn't trip.

    The platform watches the site's total demand in real time and throttles or staggers charging sessions before the supply limit is hit. Charging happens. The main switchboard stays inside its envelope.

    Tariff Window Timing

    Charging when energy is cheap.

    Where the vehicle's departure time allows, charging is shifted into off-peak windows. The same kWh arrives in the car at a lower cost per session.

    Solar Coordination

    Charging the car with the roof.

    When solar is generating and surplus is available, vehicles get charged from the roof before the grid. Self-consumption goes up. Site spend goes down.

    Peak Demand Avoidance

    Charging out of the peak.

    The platform forecasts the site's peak demand window and ensures EV charging is not contributing to it. The biggest line on a commercial bill stays smaller than it would otherwise.

    Who It's For

    Built for the sites where EVs are landing.

    Workplace Charging

    Commercial sites with employee or visitor EV charging in the car park, where charging coincides with the working day.

    Fleet Charging

    Operational fleets that return to a depot for overnight or between-shift charging, where timing flexibility is highest and the savings are largest.

    Strata & Mixed-Use

    Apartment buildings and mixed-use sites where resident EVs are arriving faster than the electrical infrastructure was designed for.

    Read more about strata applications.

    How It Works

    From charging review to live operation.

    01 · Charging Review

    We model the load.

    We look at the site's existing demand profile, the planned or existing EV charging hardware, and the building's supply envelope. The output is a quantified view of what coordination would change. The review is free.

    02 · Integrate

    We connect to the chargers.

    We integrate with the major commercial EV charging hardware platforms. We don't replace your charger vendor. We coordinate them with the rest of the site.

    03 · Operate

    We run charging every session.

    Load envelope protection, tariff window timing, solar coordination, peak avoidance. Drivers and tenants notice nothing operationally. The bill notices.

    Common Questions

    What operators ask about EV charging.

    Not in most cases. The platform respects the vehicle's departure time and the driver's required state of charge. Charging finishes when it's needed. The path it takes to get there is what changes.

    No. We integrate with the major commercial EV charging hardware platforms used in the WA market.

    Yes. We can advise on charger selection, site infrastructure capacity, and the demand profile the chargers will create before they're installed. Designing the charging strategy before the hardware lands avoids expensive retrofitting later.

    Strata buildings are one of the highest-value applications. Resident EV uptake is rising faster than building electrical capacity, and uncoordinated charging is the largest single risk to the building's supply. Coordination lets more residents charge from the same infrastructure. Read more about strata energy management.

    No. We coordinate at the site level. Your existing charger management, billing, and access control continues to operate. We add the layer that decides when and how fast each session runs against the rest of the site.

    We handle bidirectional vehicle management as a separate capability. Read more at V2G / V2L.
    Start with a Charging Review

    Coordinate EV charging with the rest of the site.

    Free charging review. We model the load impact of your existing or planned EV charging and show you the difference active coordination would make. No commitment.